Construction progress – Chicago, trip one My first trip to Chicago begins July 5th. The old sushi bar has been demoed, and the new walls have been placed. David the architect, left. Steve the electrical contractor, right The buildings facade as it stands now. Will be painted grey soon Plumbing for the bathrooms begins LED cove added to the existing ceiling soon-to-be LED cove Basement office. The closet on the far end is my choice for the lighting control panel Two more LED coves (the wooden 2×4’s on the sides of the metal studs) Next trip installation begins.