Construction progress – Chicago, trip one

My first trip to Chicago begins July 5th. The old sushi bar has been demoed, and the new walls have been placed.

img_3540
David the architect, left. Steve the electrical contractor, right
img_3517
The buildings facade as it stands now. Will be painted grey soon

Plumbing for the bathrooms begins
Plumbing for the bathrooms begins
img_3557
LED cove added to the existing ceiling

img_3560
soon-to-be LED cove
Basement office. The closet on the far end is my choice for the lighting control panel
Basement office. The closet on the far end is my choice for the lighting control panel
img_3535
Two more LED coves (the wooden 2×4’s on the sides of the metal studs)

Next trip installation begins.